Implemented communication product carbon footprint category rules (PCR)
Completed carbon reduction path planning
2022
Energy intensity decreased by 1.91GJ/turnover (million NTD) compared to 2021.
In 2022, the accumulated total power generated by Solar Energy power plant and sold to Taipower was approximately 5,962,771 kWh, which helped Taipower reduce carbon emissions by approximately 3,035.1 mt, equivalent to afforestation of approximately 303.5 ha, an area equivalent to 11.7 Daan Forest Park.
In 2022, the co-construction capacity of energy storage sites, external customers and Heavy Electricity User is 7.65MW, the self-owned field construction capacity is 7.1MW, and the co-construction capacity is 14.75 MW, contributing to increased utilization rate of renewable energy.
The adoption rate of high DMIPS/Watt microprocessors has increased from 12.6% in 2021 to 49.1% in 2022.
S-Society
2023
Completed Beixin Elementary School - Star Seeds Planned Dragon Boat Festival
Mentally challenged gift box 8/1 Billion Charity Day - blood donation event
7/27 signed a contract with St. John's University of Science and Technology to work together to cultivate green energy storage talents. The group will be self-organized or jointly organized throughout the year Co-organized more than nine green energy storage symposiums, mobilized 33 manpower, and attracted more than 10,300 participants
2022
Total employee training hours reached 1,681 hours
100% managerial-level and above senior executives are local residents
Billion’s senior managers totaled 38, including 12 women, accounting for 31.58%
Throughout the year, the Billion Group either self-organized or co-organized, there were more than five green energy storage symposiums, mobilizing 40 manpower and attracting more than 16,000 participants.
G-Corporate Governance
2023
ESG official website launched.
Completed the ISO 27001:2022 version of the information security system verification.